Inactive door leaf
The Guild of Architectural Ironmongers publication Glossary of architectural hardware terms defines an inactive door leaf as 'The door leaf, in a pair of doors which is stationary and to which the strike plate of the locking mechanism is fitted. The other door in the pair is known as the active door leaf and secures the door.'
Effectively this is also called a slave door which is defined as 'an inactive door leaf, which opens second in comparision to an active door leave which is 'the door leaf, in a pair of doors, which opens first, and the one to which the locking mechanism is fitted'.
An active door leaf being 'the door leaf, in a pair of doors, which opens first, and the one to which the locking mechanism is fitted. The other door in the pair is known as the slave door leaf or inactive door leaf.' See also slave door leaf.
[edit] Related articles on Designing Buildings
- Access control.
- Active door leaf.
- Digital door lock market.
- Doors.
- Emergency Exit Device.
- Entry control.
- External doors..
- Fire Door Inspection Scheme.
- Fire door.
- Fire Doors (DG 524).
- Fire.
- Grenfell tower.
- Hinge.
- Home security solutions market.
- How door locks work.
- Installing fire doors and doorsets (GG 86).
- Intumescent strip.
- Mortice lock.
- Mortise vs mortice.
- Noise - doors and windows.
- Outbuildings security.
- Perimeter security.
- Protected door.
- Self-closing device.
- Security and the built environment.
- Security glazing.
- Slave door leaf..
- Smoke control door.
- Sneck.
- Types of alarm.
- Types of door
- Types of lock.
- Width of doors stairs and escape routes.
Featured articles and news
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.





















